乐山附近有没有服务

Welcome to Shandong zhonghewogong environmental protection equipment Technology Co., Ltd., a manufacturer specializing in sewage treatment equipment
National hotline
fifteen billion fifty-three million six hundred and twenty-five thousand five hundred and fifty-eight

Product recommendation

Hotline:

fifteen billion fifty-three million six hundred and twenty-five thousand five hundred and fifty-eight

Email: 23697831@qq.com

Telephone: fifteen billion fifty-three million six hundred and twenty-five thousand five hundred and fifty-eight

Address: No. 552, north outer ring road, Shunwang street, Zhucheng City, Shandong Province

Installation site of buried integrated sewage treatment equipment in Jiangxi Province




Installation site of buried integrated sewage treatment equipment in Jiangxi Province

Installation of buried integrated sewage treatment Steps:

1. According to the installation drawings and basic drawings, prepare the foundation according to the size of the installation scheme, and make the concrete floor. The basic requirement is 5t / m2, the foundation must be horizontal and should be installed after the end of the concrete foundation pouring maintenance period. If the equipment is installed under the floor, the relative height of the foundation to the ground should be based on the size of the map. At the same time, the width of surrounding excavation should be more than 500mm away from the baseline of pipeline installation.

2. When the equipment is installed in place, the installation and connection of pipelines shall be considered. When the equipment is in place, it must be based on the manual weight of the equipment. According to the tonnage of the crane, according to the site comparison chart installation sequence. The position and direction of the cylinder should not be misaligned. It must be right.

3. Connect the pipe according to the installation drawing. After the equipment is installed in place, the connecting pipe shall be fixed with rubber pad, so that the joint will not leak.

4. After installation, the equipment and foundation floor must be connected and fixed to ensure that the equipment will not flow up and down. The integrated sewage treatment equipment must also inject sewage into the equipment (when there is no sewage, replace it with other water sources or tap water), which must be sufficient. Over 70% to prevent equipment from floating. At the same time, check the pipeline for leakage. The pipeline of test water shall not leak and the equipment shall not be affected by surface water, so the equipment is not aligned and inclined.

5. After the equipment is installed, the equipment around the gap can be filled with soil and tamped. When filling the ground filler, attention should be paid to: (1) the well cover of the equipment must be about 50 mm above the floor; (2) do not let the soil block the air inlet on the well cover.

6. Connect the control panel of the electric control cabinet to the equipment. When wiring, please pay attention to the direction of fan and submersible pump motor. The control cabinet should be placed in a ventilated place to keep it dry. General control cabinet should not be placed outdoors. Avoid sun, rain, etc. In order to avoid leakage of control board and terminal, please burn the control board.

7. Precautions: (1) the installation of the equipment must ensure that there is no water in the rain. (2) The outlet pipe of the equipment must be lower than 0.4m relative to the ground. (3) There should be no heavy objects above the equipment, and no large vehicles can pass through. (4) generally, the internal sewage should not be evacuated to prevent the underground water from floating up the equipment.

8. According to the standard connection and plane layout, pay attention to the installation drawing and pipe connection drawing of the equipment. If any arrangement is required by the user, it must be submitted when signing the contract.

9. Connect the fan and water pump control lines, and pay attention to the rotation direction of the fan and water pump.



 


Hot selling product recommendation:

  •  Dairy wastewater treatment equipment

    Dairy wastewater treatment equipment

  •  Integrated sewage treatment equipment

    Integrated sewage treatment equipment

  •  MBR rural domestic sewage treatment equipment

    MBR rural domestic sewage treatment equipment

  •  Small hospital sewage treatment equipment

    Small hospital sewage treatment equipment

  •  Truss car scraper suction dredger

    Truss car scraper suction dredger

  • Related articles recommend:

    · Operation method and operation steps decomposition of sewage treatment equipment
    · Installation steps of blower and its function in sewage treatment equipment
    · Installation steps of industrial sewage treatment equipment, illustrated in detail
    · Introduction of activated sludge cultivation steps of sewage treatment equipment

    Related comments:

    Feedback from [Chongqing] on the use evaluation of purchased sewage treatment equipment

    Has been my partner, your company's equipment and service are impeccable, has reached a long-term cooperation intention with your company.

    Feedback of evaluation on the use of purchased sewage treatment equipment from Baoji City

    The equipment used for a few days, really good, good quality, low noise, and the price is very cheap, value for money, very satisfied. Customer service was also very good. I'll come back next time when I have the opportunity.

    Evaluation of the purchase of aquaculture wastewater treatment equipment from [Hefei city]

    As time goes by quickly, we have been cooperating with China hewogong environmental protection equipment for nearly three years. We are an influential sewage treatment equipment manufacturer. Thank you very much. The service was up to standard

    Evaluation on the use of cleaning wastewater treatment equipment purchased from Zunyi City

    I was dry tableware cleaning, on a set of wastewater treatment equipment, half a year, the effect is very good. Thank their after-sales master for repairing the washing machine at home for free.

    Application evaluation of chemical wastewater treatment equipment purchased from [Tai'an City]

    The effect of the equipment is very good. I have chemical wastewater here. The local environmental protection department has detected that the pollutant concentration is very high, and they have been worried about the poor treatment. The Fenton + micro electrolysis process designed by the company was half understood and half understood at that time, but after the equipment arrived at the site, the effluent efficiency was improved

    Share with: